Here it is, the thing we’ve been bending our backs to reach: the bedrock stream flowing under Raleigh’s capitol region. And those crafty engineers realized that they didn’t have to put a concrete or stone floor in this part of the stormwater system, since the rock has very low erodibility. Geology FTW.